In April 1998, Professional Engineer Timothy Shelley completed an inspection of Mill #5. The purpose of the inspection “was to identify any elements of the existing roof structure that are deficient”. Click on the image for the report.

Of the approximately 200 structural girders, the inspection found:

  • 20% in Excellent Condition
  • 45% in Good Condition
  • 22% in Fair Condition
  • 3% in Poor Condition
  • 6% were not inspected because they had been upgraded in September 1997
  • 4% could not be accessed
You can read the report here: report.